Historic photograph of Selva di Val Gardena showing the village’s traditional Alpine architecture, lively town square and the Dolomites in the background.

The Oswald Grand Hotel

The rebirth of a legend

In the heart of Selva di Val Gardena, surrounded by the quiet grandeur of the Dolomites, stands a hotel that has been part of the valley’s history since 1896.

It is The Oswald Grand Hotel.

Today, the Oswald is reborn following an extensive renovation, bringing the charm of its heritage into the present day. An authentic elegance, shaped by details, materials and atmospheres that look to the past without ever being confined by it.

A place with a story to tell — and many more still to be lived.

Exterior view of The Oswald Grand Hotel at sunset, featuring its distinctive central tower topped by a tall conical roof, elegant cream and wood façades, balconies and numerous illuminated windows. The main entrance opens onto the street, while a dense fir forest covers the mountain slope directly behind the hotel.
Elegant view of the Lounge Bar at the Oswald Grand Hotel, featuring a sophisticated seating area in the foreground with two generously upholstered armchairs in cream and taupe tones arranged around a small round coffee table on a circular rug. In the background, the illuminated bar counter is surrounded by high stools and tables with warm-toned seating. Wood-panelled walls and ceilings, large glass surfaces, warm ambient lighting and a striking crystal chandelier at the centre of the room give the space an elegant, intimate and contemporary character. An extensive selection of bottles displayed behind the bar completes the exclusive atmosphere, making it an ideal setting for aperitifs, cocktails and moments of relaxation in the Dolomites.
Peaceful Swiss pine relaxation room at The Oswald Grand Hotel, featuring light Swiss pine wood throughout the interior. Upholstered relaxation benches with soft cushions line both sides of the room, while indirect warm lighting enhances the tranquil atmosphere. The natural Swiss pine wood gives the space a warm alpine character.
Logo The Oswald Grand Hotel Val Gardena

Some hotels are created to welcome guests. Others, over time, become part of the history of a place.

1896

Historical photo of Selva di Val Gardena at the end of the 19th century, featuring traditional buildings and the surrounding mountain lands

The opening

In the heart of Selva di Val Gardena, its story began in the summer of 1896, when Karl Pitscheider, postmaster and a man with a great passion for hospitality, opened the Hotel Zur Post, expanding the La Gërva inn.

From the very beginning, the hotel was much more than a place to spend the night. It was a place where people met, listened to music, talked and shared new ideas.

This is how the Oswald came to be: not simply as a hotel, but as a home open to the world.

1906

Historical photo of Hotel Oswald from the year when the main building and the annex were connected by the iconic turret.

The birth of an icon

In 1906, the hotel was transformed with the construction of its distinctive tower, destined to become one of the symbols of The Oswald and Selva di Val Gardena.

It was during these years that the name Oswald von Wolkenstein first appeared — the medieval poet born in these mountains — forever linking the hotel to the history and culture of the valley.

By the beginning of the 20th century, The Oswald had already become an international destination, welcoming aristocrats, artists, scientists and travellers from around the world. Among its distinguished guests were Sigmund Freud in 1907 and Enrico Fermi in the 1930s.

1929

First winter season of Hotel Oswald, featuring the building and its iconic turret, with the roof covered in snow.

The first winter

In 1929, The Oswald opened its doors for the first time during the winter season as well.

The decision already looked towards the future of the valley, which in the following decades would become increasingly connected to winter tourism. Shortly afterwards, central heating was introduced — a true innovation for its time.

The Oswald had by then become one of the most renowned Grand Hotels in the Alps.

But history is not always made of easy moments.

1945

Hotel Oswald used during World War II as a hospital for German soldiers.

A time of change

The two World Wars left a profound mark on the history of the hotel and the valley.

During the Second World War, The Oswald was first used as a school and later as a military hospital. After the war, it went through years far removed from its original vocation, yet it endured.

In the years that followed, it slowly came back to life, becoming a place of study and gathering for students from the universities of Oxford and Cambridge.

Once again, The Oswald rediscovered its soul: a place capable of welcoming people and stories from different worlds.

1966

View of the terrace and square in front of Hotel Oswald, filled with people, highlighting how the hotel has always been a landmark for the local community.

A new chapter

In 1966, the hotel was sold to a Milanese financial group, and in the years that followed, the Oswald gradually fell into decline.

But its story did not end there.

1978

Project plan for the renovation of Hotel Oswald presented in the 1980s.

Reopening by the hoteliers of Selva di Val Gardena

In 1978, 23 hoteliers from Selva di Val Gardena decided to join forces to bring one of the valley’s most important landmarks back to life.

It was a gesture that says a great deal about the spirit of Selva: the Oswald does not belong only to those who run it. It is part of the community, its memories and its history.

1980

Immagine migliorata

The rebirth of Hotel Oswald

In 1980, the hotel reopened its doors.

It was a new beginning.

Since then, several more decades have passed. The valley has changed, the way we travel has changed, and the very idea of hospitality has evolved.

The Oswald, however, is still here.

2025

A cozy alpine hotel at dusk, surrounded by snowy landscapes and fir trees. Warm lights illuminate the building, creating a welcoming, serene atmosphere.

A new chapter

In 2025, a new chapter begins: following a major renovation, the hotel comes back to life with a new identity, while preserving its connection to its history.

Wood, stone, textiles, light and contemporary details meet the elements that tell the story of the past. The aim is not to recreate a museum, but to breathe new life into a place that has always been meant to be lived in.

Today, The Oswald Grand Hotel looks to the future without forgetting the past.

Snow-covered alpine hotel with a steep roof sits in front of sunlit, snowy mountains. A tranquil, wintry atmosphere is captured at sunset.

More than 130 years have passed since the hotel first opened its doors.

Throughout this time, seasons, generations and the way we experience the mountains have changed. New guests have arrived, while others have returned. Rooms, spaces and technologies have evolved.

But one thing has remained unchanged: the desire to welcome those who come to Selva di Val Gardena.

Perhaps this is the true meaning of a long history in hospitality.

Not preserving everything exactly as it was, but knowing what is worth preserving — and having the courage to keep evolving.

Yesterday and today coexist, with both taking centre stage. The renovation of The Oswald was born from the desire to preserve its soul, blending the heritage of the great Alpine Grand Hotels with the lightness of contemporary design.

Stone, wood, fabrics and light come together to create warm, inviting spaces, where every detail recalls the roots of the place without ever renouncing the present.

An architecture that tells a story, and a space designed to live it.

Snow-covered mountain resort at sunset. Warm lights glow from a rooftop pool and windows. Surrounding cabins nestled among snowy pine trees. Cozy ambiance.
Interior detail of the Oswald Grand Hotel featuring distinctive hand-carved wooden figures displayed on a red wall and illuminated by natural light.
Close-up of a person lying on a treatment bed during a wellness treatment at The Oswald Grand Hotel. The person rests their head on their arms while the surrounding space, with warm natural tones and soft lighting, creates a peaceful and relaxing atmosphere. The image focuses on a quiet moment of rest during the spa treatment.

At The Oswald Grand Hotel, our historic rooms and new suites offer two different ways of experiencing hospitality, united by the same attention to comfort, beauty and thoughtful details.

Sky Room at the Oswald Grand Hotel featuring an elegant double bed dressed in crisp white linen, soft pillows and a refined relaxation area. The room combines contemporary furnishings, natural wood details and warm tones, creating a bright, welcoming and sophisticated atmosphere in the heart of the Dolomites.